Urgent Requirements
GULFFASTEquipment and Manpower
Lay & Lift · Ras Tanura

Side Boom (Pipelayer) Rental in Ras Tanura

40 t, 60 t and 90 t side booms · stringing, lowering-in and tie-in support. Dispatched to Ras Tanura from our own yard in Al Khobar — roughly 90 minutes.

Request a Quote →

Lay & Lift work in Ras Tanura

Replacement work on the transmission network around Ras Tanura means lifting into an existing corridor, often alongside lines that stay live. Lowering-in a replacement section next to in-service pipe changes the lift plan: spacing is dictated by what you must not touch, not by what is convenient for the machines.

Pipeline work in Ras Tanura

The refinery and the Juaymah export terminal sit on a dense gas and crude transmission network. Replacement and refurbishment of existing transmission lines is ongoing work rather than an occasional project.

Transmission line replacement and refurbishment on the gas and crude network feeding the refinery and the Juaymah export terminal, plus scraper trap and valve station work.

A mix of planned replacement programmes and unplanned integrity work. Both are permit-controlled and both move faster than a general construction site.

Side Boom (Pipelayer) — at a glance

Lift capacities
40 t · 60 t · 90 t
Typical duty
Stringing, cradling, lowering-in, tie-in support, skid handling
Hire basis
Bare hire or with certified operator
Minimum term
Quoted against the spread duration, not a day rate
Mobilisation
Low bed from Al Khobar; we own the low beds as well

Why capacity is chosen by the lift plan, not the pipe diameter

Contractors often ask for a tonnage based on the line size. The load that actually governs is the lowering-in plan: the number of machines on the string, the spacing, the boom radius at the worst point, and the dynamic allowance the lift study applies. A 24-inch line lowered in with three machines at wide spacing can demand more per machine than a larger line with five. Send us the lift plan or the pipe schedule and the ditch profile, and we will tell you which of the three capacities the job actually needs — including when a smaller machine is enough, which is usually the cheaper answer.

Full specifications, sizing guidance and the questions worth settling before you commit to a machine are on the main Side Boom (Pipelayer) page. For everything we mobilise into Ras Tanura, see pipeline equipment in Ras Tanura.

Side Boom (Pipelayer) in Ras Tanura — FAQ

Roughly 90 minutes from our Al Khobar yard. We own the hydraulic low beds that move our equipment, so transport is part of the commitment rather than a dependency on a third-party haulier. A mix of planned replacement programmes and unplanned integrity work. Both are permit-controlled and both move faster than a general construction site.

Side Boom (Pipelayer) elsewhere in our coverage

Other pipeline equipment in Ras Tanura

Trades supplied with this equipment in Ras Tanura

Side Boom (Pipelayer) in Ras Tanura

Tell us the line size, the scope and the date. We will tell you honestly what can move and when.

+966 50 752 9347

Request Direct Quote

GulfFast Al Khobar Direct Supplier Desk • Fast Response

Step 2 of 3