Lifting inside an operating Jubail plant is a congestion problem before it is a capacity problem. Pipe racks, existing services and live units restrict where a machine can stand and how far it can slew, so the governing constraint is usually radius and access rather than tonnage. Send the plot plan with the enquiry and the sizing conversation gets much shorter.

Pipeline work in Jubail

Jubail Industrial City concentrates more petrochemical plant, and therefore more in-plant and interconnecting pipework, than anywhere else in the Kingdom. Tie-ins, revamps and shutdown pipework run continuously alongside new-build.

Mostly in-plant and interconnecting pipework rather than open right of way: tie-ins, revamps, unit interconnects and shutdown pipework inside operating petrochemical plants.

Shutdown-window driven. Dates are fixed months ahead and then absolutely immovable, so equipment is placed before the window opens, not on its first day.

Side Boom (Pipelayer) — at a glance

Lift capacities
40 t · 60 t · 90 t
Typical duty
Stringing, cradling, lowering-in, tie-in support, skid handling
Hire basis
Bare hire or with certified operator
Minimum term
Quoted against the spread duration, not a day rate
Mobilisation
Low bed from Al Khobar; we own the low beds as well

Why capacity is chosen by the lift plan, not the pipe diameter

Contractors often ask for a tonnage based on the line size. The load that actually governs is the lowering-in plan: the number of machines on the string, the spacing, the boom radius at the worst point, and the dynamic allowance the lift study applies. A 24-inch line lowered in with three machines at wide spacing can demand more per machine than a larger line with five. Send us the lift plan or the pipe schedule and the ditch profile, and we will tell you which of the three capacities the job actually needs — including when a smaller machine is enough, which is usually the cheaper answer.

Full specifications, sizing guidance and the questions worth settling before you commit to a machine are on the main Side Boom (Pipelayer) page. For everything we mobilise into Jubail, see pipeline equipment in Jubail.

Side Boom (Pipelayer) in Jubail — FAQ

Roughly 90 minutes from our Al Khobar yard. We own the hydraulic low beds that move our equipment, so transport is part of the commitment rather than a dependency on a third-party haulier. Shutdown-window driven. Dates are fixed months ahead and then absolutely immovable, so equipment is placed before the window opens, not on its first day.

Side Boom (Pipelayer) elsewhere in our coverage

Other pipeline equipment in Jubail

Trades supplied with this equipment in Jubail

Side Boom (Pipelayer) in Jubail

Tell us the line size, the scope and the date. We will tell you honestly what can move and when.

+966 50 752 9347

Request Direct Quote

GulfFast Al Khobar Direct Supplier Desk • Fast Response

Step 2 of 3