Side Boom (Pipelayer) Rental in Jubail
40 t, 60 t and 90 t side booms · stringing, lowering-in and tie-in support. Dispatched to Jubail from our own yard in Al Khobar — roughly 90 minutes.
Request a Quote →Lay & Lift work in Jubail
Lifting inside an operating Jubail plant is a congestion problem before it is a capacity problem. Pipe racks, existing services and live units restrict where a machine can stand and how far it can slew, so the governing constraint is usually radius and access rather than tonnage. Send the plot plan with the enquiry and the sizing conversation gets much shorter.
Pipeline work in Jubail
Jubail Industrial City concentrates more petrochemical plant, and therefore more in-plant and interconnecting pipework, than anywhere else in the Kingdom. Tie-ins, revamps and shutdown pipework run continuously alongside new-build.
Mostly in-plant and interconnecting pipework rather than open right of way: tie-ins, revamps, unit interconnects and shutdown pipework inside operating petrochemical plants.
Shutdown-window driven. Dates are fixed months ahead and then absolutely immovable, so equipment is placed before the window opens, not on its first day.
Side Boom (Pipelayer) — at a glance
- Lift capacities
- 40 t · 60 t · 90 t
- Typical duty
- Stringing, cradling, lowering-in, tie-in support, skid handling
- Hire basis
- Bare hire or with certified operator
- Minimum term
- Quoted against the spread duration, not a day rate
- Mobilisation
- Low bed from Al Khobar; we own the low beds as well
Why capacity is chosen by the lift plan, not the pipe diameter
Contractors often ask for a tonnage based on the line size. The load that actually governs is the lowering-in plan: the number of machines on the string, the spacing, the boom radius at the worst point, and the dynamic allowance the lift study applies. A 24-inch line lowered in with three machines at wide spacing can demand more per machine than a larger line with five. Send us the lift plan or the pipe schedule and the ditch profile, and we will tell you which of the three capacities the job actually needs — including when a smaller machine is enough, which is usually the cheaper answer.
Full specifications, sizing guidance and the questions worth settling before you commit to a machine are on the main Side Boom (Pipelayer) page. For everything we mobilise into Jubail, see pipeline equipment in Jubail.
Side Boom (Pipelayer) in Jubail — FAQ
Side Boom (Pipelayer) elsewhere in our coverage
Other pipeline equipment in Jubail
Trades supplied with this equipment in Jubail
Side Boom (Pipelayer) in Jubail
Tell us the line size, the scope and the date. We will tell you honestly what can move and when.
+966 50 752 9347Request Direct Quote
GulfFast Al Khobar Direct Supplier Desk • Fast Response
